Petro Chem Technologies, Inc. PO Box 540 Berkeley Heights, NJ 07922 Phone: 908-322-6920 Fax: 908-322-4308
Name:
Company:
Address:
City: State:
Zip Code:
Phone:
Fax:
email:
1. Loading Unloading 2. Pipe Size: 3. Product(s) to be handled: 4. Flow Rate: GPM 5. Is static a concern? Yes No 6. Pressure: Positive Negative 7. Product Temperature: 8. Dry Line Wet Line 9. Is vapor and/or purge line required? Yes No 10.Loading/Unloading Method: Tight Fill Splash Fill Suction Other If tight fill, type connection required Flanged Union Vapor Cone Coupler/Adapter Other 11.Will a valve be required? Yes No If yes, please describe: 12. Will arm service both sides of platform? Yes No Please use the sketch at right to complete the following: Connections to be made at the following points (indicate from sketch 1-5): If more than one connection is required: Distance between connections Connector Sequence (A) Riser (drop feed) High (B) Riser (Horizontal) (C) Riser (Up-Feed) (D) Center (Riser to Tank Car) (E) Connection Height (Top) (F) Connection Height (Bottom) Customer Preferences (If Applicable) Type of Arm (Emco Wheaton Model Number) Desired metals and seals Additional Considerations: Distance between Risers (K) Safety Rail to Riser Center Risers are Flanged Threaded Distance between Ground and Track: Distance of Closest Obstructions Safety Rail Piping Canopy Support Beam other Is a Valve Required? Yes No If yes, describe type and location:
Actuation Swivel Joint Style: Split Flange w/spring energized seals Standard joint w/V-ring seals Aluminum Joint (O-ring seals only) Steam Jacketed Joint [ ] Split Flange - PTFE Lined Split Flange Joint with Leak Detection and Purging Capabilities
Options for Open Dome Loading: Automatic Shut-off Pneumatic/Hydraulic Actuation Telescopic Drop Pipe