40 Stirling Road 
Suite 208
Watchung, NJ 07069 
P: 609.924.3334   F: 609.924.7774

752 Route 518 Skillman, NJ 08856  
P: 609.924.3334   F: 609.924.7774

Railcar Transfer System


  • 8” underground double wall product piping

  • 16 manhole hydrant connections

  • Truck with hydraulically operated transfer arms, turbine meter, electronic preset, digital control valve, air eliminator, filtration, product return drainage system.

    Eliminates need for loading rack structure, multiple valve and loading arm positions, concrete foundation costs and electrical installation costs.